Flex Manager
De top 21219 Flexmanagers van Nederland
21219 professionals

 beschikbaar?

interimmanagement TIP: soortgelijke CVs vinden

Project Manager

Project Manager

Work Experience

1975-1978 Apprenticeship technical draftsman K. Theiler AG Civil Engineers, Thun
1978-1980 Apprenticeship masonry Helmle AG, CH
1978-1980 Site Supervisor Helmle AG Civil, CH Industrial-, civil building works & finishes

1984 Technical Site Engineer Bruinette, Kruger & Stoffberg,Johannesburg RSA, New Witwatersrand Technikon & renovation of Art Gallery, Johannesburg, RSA
Value 150 Mio Rand

1985 Site Manager, Rapp & Maister, Johannesburg, RSA, Development of Sandhust Gardens, Four block respective 129 no of flats including carports, garages, plant services, roads, landscaping, swimming pool and security system
Value 95 Mio Rand

1986-1987 Assistant Contract Manager, Rapp & Maister, Johannesburg, RSA, New administration building for the Standard Bank of South Africa,
Site establishment, concrete structure, mechanical and electrical installation, finishes
Value 130 Mio Rand

1988-1992 Contract Manager
Helmle AG Civil contractors, Thun, QS, tendering, quotations site supervision and financial control of various sites like industrial buildings, apartments, roads and under water constructions, concrete cutting and drilling renovation of historical buildings, perimeter insulation, concrete repair work and small works

1993 Site Manager, Preiswerk AG, Zürich
New administration building DLZ, Zürich,Site establishment, concrete structure, finishes
Value 20 Mio CHF

1993-1994 Project Manager, ARGE BBL Switzerland
New 5 star Marco Polo Palace Hotel, Almaty, Kazakhstan
Site establishment, personal camp for 600 PAX, renovation work of 40 flats European standard, establish of new concrete-, steel bending- and pre cast production plant, concrete structure, mechanical- and electrical installation, plant services, finishes
Value 150 Mio USD

Turn key projects in Almaty
New airport- and city head office for Lufthansa, Head office for Bayer chemicals, Apartment renovation for the German ambassador, director of the Dresdner Bank and ORYX Oil company, Electrical- and ICS installation for Kaspi SHELL.

1995-1996 Project Manager LEI AG Switzerland
New TOKO Bank, Moscow, Russia
Logistic and custom matters Almaty-MSC, site establishment, concrete structure, perimeter insulation, plant services and finishes work
Value 45 Mio USD

Managing director
LEI AG Moscow
Set up and registration of the company as Russian legal entity, receive the design- and building permit, custom-, legal- and financial matters, work accusation.

1997 Site Manager, EEMA Engineering (Philip Morris), Neuchâtel, Switzerland Capacity increase project Kharkiv Tobacco factory (2.0 – 7.0 bio/cig/y), Ukraine. Value 18.0 mio / USD Building works, plant services, secondary equipment, primary project, building permit, design co-ordination, administration work

1997-1998 Project Leader, EEMA Engineering (Philip Morris), Neuchâtel, Switzerland Capacity increase project Krasnodar Tobacco factory (7.0-17.6 bio/cig/y), Russia. Value 85.0 mio / USD Building works, new warehousing facilities (17`500 M2), up-grade of all plant services, Secondary equipment installation, up-grading of the feeding- & dedusting system, EHS, building permitting, financial control, 650 preparation work, design studies and project & design co-ordination. Developing, concept & planing studies of the master plan up to 40.0 bio/cig/y. Project management & reporting to management.

1998-1999 Project Manager, EEMA Engineering (Philip Morris), Neuchâtel, Switzerland Ware house capacity increase project PHILSA tobacco factory, Izmir Turkey (PHILSA production capacity 28 bio/cig/y) Value 12 mio/USD
Site management, EHS procedure implementation, warehouses project of 32`000 M2. Roads & parking areas of 20`000 M2, up-grade & modernisation of water treatment plant to full fill ISO 9001 standards, new fire pump house station, up-grade of underground fire fighting system, testing- & commissioning phase, hand over to Client.

2000-2001 Project Leader, EEMA Engineering (Philip Morris), Neuchâtel, Switzerland, Capacity increase project PML Klaipeda tobacco factory (7.0-12.0 bio/cig/y) in Lithuania, value 13.0 mio/USD Planning & building works for new Primary extension building including mechanical corridor. Refurbishing, installation & start-up of Primary equipment (Stem- & Lamina line, fully automated bin filling station), plant services up-grade (electrical, boiler, compressed air, low current systems etc). Secondary equipment (preparing of 650 for new Protos group), building permit, financial control, project- & design co-ordination, commissioning of new extension, state commissioning, Project management, reporting & co-ordination works between EEMA & PML (Client).

2001-2002 Project Manager, PMI Engineering (Philip Morris), Neuchâtel, Switzerland Capacity increase project PMPSA Krakow, Tobacco factory (10.0-23.0 bio/cig/y) in Poland, Total project value 200.0 mio/USD
Planning- design & building works for new Primary extension building in 2 steps. Installation & start-up of Primary equipment (Lamina line & new PC kitchen), up-grade of plant services like electrical system, boiler, compressed air, low current systems etc. Design- & building works, building permit for new administration building (250 working stations, canteen, CR etc.), financial control, project- & design co-ordination, commissioning of new extension, state commissioning, project management, reporting & co-ordination works between PMI & PMPSA (Client).

2002-2004 Senior Project Manager, PMI Engineering (Philip Morris), Neuchâtel, Switzerland Capacity increase project PM Germany, Project B404, Tobacco factory (65.0-90.0 bio/cig/y) in Berlin, value 78.0 mio/USD, Planning-, design & building works for new Primary extension building including technical floor, new utility building, refurbishment of existing primary building, external works & new gatehouse. Installation & start-up of new Primary equipment (two lamina lines in parallel, AC/PC kitchen, fully automated bin filling station & cut filler store including AGV’s, blend selector, ripping machine). Up-grade of plant service systems like compressed air, chilled water, power, low current systems, control system, CCTV, fire detection system etc, refurbishment of five electrical substations with new equipment. The complete project had to be realised during normal production (3-shift operation). Preparing of masterplan for the complete factory (capacity up to 90 bio/cig/y), preparing of budget figures for various projects. Prepare 650 for Phase 1 masterplan project. Prepare & obtain building permit including environmental permit, set-up a financial control system, develop ECM manual, project- & design co-ordination, commissioning of new extension, state commissioning, project management, set-up EHS control system, reporting & co-ordination works between PMI & PMG (Client).

2005 Senior Project Manager, PMI Engineering (Philip Morris), Neuchâtel, Switzerland Conceptual study for Greenfield factory in Kroatia / Kanfanar, Region of Rovinj. Capacity 17 bio/cig/y.

2005 (May-August) Manager Industrial Project’s Asian Pacific region, PMI Engineering (Philip Morris), Kuala Lumpur, Malaysia, Conceptual study for Greenfield factory in Korea, capacity 17 bio/cig/y, value 95 mio/USD
Study & execution of factory expansion in Seremban (Malaysia), value 16 mio/USD
Conceptual study for factory expansion in Sampoerna (Surabaya, Indonesia), capacity 25 mio/cig/y, value 100 mio/USD
Execution of factory expansion project in PM Australia, value 87 mio/USD

2005-2009 (Jun) Senior Project Manager
PMI Engineering (Philip Morris), Neuchâtel, Switzerland
Capacity increase project Papastratos Greece, Project White tower, Tobacco factory (20.0 bio/cig/y) in Athens, value 95.0 mio/Euro. Planning-, design & construction works for new Primary plant for Papastratos in Greece. The scope includes the construction of 48’000m2 of production- support- & administration buildings including walk able technical floors, utility distribution, external works, landscaping & new gatehouse. Installation & start-up of new Primary- / Secondary production equipment like AC/PC kitchen, fully automated bin filling station, cut filler store including AGV’s, blend selector & ripping machine. Newly installation of plant service systems like compressed air, HVAC, sprinkler, chilled water, power, waste water treatment plant, rainwater- / sewage system, low current systems, BMS control system, CCTV, fire detection system etc. Preparing of master plan for the complete factory (capacity up to 30 bio/cig/y), preparing of budget figures for various sub projects. Preparation works & obtaining of the building permit including environmental permit, set-up a financial control system, develop & implement Execution Control Manual, set-up & follow procurement team for the project in close conjunction with the project controller, project- & design co-ordination, commissioning of new plant, state commissioning, project management, training of new hires, set-up EHSS control system, be compliant with Factory Mutual guidelines reporting & co-ordination works between PMI & Papastratos (Client).


2009 Jun-Oct Senior Project Manager, R&D (Philip Morris), Neuchâtel, Switzerland, Relocation of science laboratory from Belgium, fit-out project Singapore, value 15 mio/Euro, Evaluating / recommendation of the best suitable location in various science parks, negotiation of lease agreement with landlord, negotiate EPC contract, planning & design coordination, set-up procurement strategy, project timing & CMS procedures.
5.500m² of fit-out of bioscience laboratories in a leased science park building containing delivery- / storage- / inspection area, analytical- / chemical- / biological laboratories, necropsy area, animal housing facilities, SPV / none SPV sectors, control room, washing- / hygienic areas, offices- / conference facilities, technical- & logistic rooms, canteen, relax areas, reception & transport facilities.

2009 Nov- Senior Partner of Genta – Consultant to METAG (Turkey), Senior Partner / Business Development for Genta S.A. (Izmir Turkey) medium size mechanical & electrical contractor.Consultant Projects / Business Development for METAG S.A. (Ankara Turkey), large size General Contractor


Education

SCHOOLING
1966-1970 Primary school, Gwatt / Thun
1970-1975 High school, Thun
1975-1980 Technical high school, Thun
1980-1982 Studies Civil engineering, Zürich
SPECIAL COURSES
1977 Site surveying, technical high school
1977 Algebra, technical high school
1987 Site establishment, SBV Sursee
1988 QS, tendering, quotations, SBV Sursee
1990 Accounting & Finances, Thun

COMPUTER COURSES
1993 Baustar 4.0, QS & tendering, Sursee
1993-2000 WIN 97, MS Project 98, Word 97, Excel 97, Power point 97, NT 4.0, Outlook 97.


Skills

Client oriented safety / quality / time / commercially focused, results orientated, project management / construction professional with over twenty years extensive international experience seeks new challenges in the construction industry. Well versed in project management, safety / quality, timing & commercial systems, reporting procedures & contract administration for contractors, consultants and client organizations. Proven track record of successfully managing, planning, executing, motivating & financially controlling projects. Self-motivated with good technical and interpersonal skills, highly adaptable and flexible with a logical and practical approach to problem solving. Works well under pressures & motivates project teams. After 15 years working in the tobacco industry as senior project manager, representing Philip Morris International as Clients representative in many projects in various locations.

Languages

Deutsch, Englisch

 beschikbaar?

Interim managers zoeken:

Opdrachtomschrijving :