BELGIUM CONSTRUCTION PROJECT.

1991 to 1994 STRABAG nv. (BELGIUM).
PROJECT: BASF ANTWERP: POLYPROPYLENE FOR PVC PRODUCT.
POSITION: SITE CONSTRUCTION MANAGER.
1. CIVIL WORK AND STEEL CONSTRUCTION.


OVERS SEAS CONSTRUCTION PROJECT BETWEEN.(1978 TO 1991).

1978 - 1984;SAOUDI ARABIA / KHAMIS MUSHAIT.
TAG Co. RYAD.
MILITARY CONSTRUCTION PROJECT.
POSITION: SITE CONSTRUCTION MANAGER.
CIVIL WORK, BUILDING FINISHING WORK, PIPING, ELECTRICAL,LANDSCAPING.
400 HOUSES, 2 SCHOOLS, WATER TRATMENT PLANT.

1985 - 1986 SAOUDI ARABIA POWER LINE PROJECT.
A.M.AL-ISSA / ELECTRABEL BELGIUM.
POSITION: SITE MANAGER
CW & STEEL CONSTRUCTION.(+/- 150 km POWER LINE)

1987 - 1988 REPUBLIC OF ZAIRE/KINSASHA).
UNIBRA SA. (BRUWERY PROJECT +/- 6000 hl/year).
POSITION: CONSTRUCTION MANAGER.
BUILDING RENOVATION; CONCRETE WORK, STEEL CONSTRUCTION, PRODUCTION LINE EQUIPMENT, WATER TREATMENT SYSTEM OF THE BRUWERY OF THE EXISTING FACTORY.

1988 - 1991 REPUBLIC OF ZAIRE/KOLWEZI.
GECAMINE.(MINING EXTRACTION PROJECT OF COPPER).
POSITION: SITE CONSTRUCTION MANAGER;CIVIL WORK AND STEEL CONSTRUCTION.
PROCESSING PLANT OF COPPER ELECTROLYSED SYSTEM, REFRIGERATION BUILDING, CONVEYOR LINE, STORAGE BUILDING, MINERAL BREAKERS AND POWER GRINDING, POWER STATIONS, POWER LINE (STEEL TOWER) +/- 7 km).

OVERS SEAS CIVIL WORK CONSTRUCTION PROJECT.(1992 TO 1997).

1992 - 1994 ABB/HAMON LUMMUS - (HOLLAND).
ELECTRICAL POWER PLANT STEEM-TURBINE-GAZ.
POSITION:SITE CONSTRUCTION MANAGER.
- COORDINATION OF MATERIAL AND EQUIPMENT DELIVERY FROM POLAND, UK, GERMANY AND BELGIUM.
- SITE CONSTRUCTION COORDINATION (STEEL STRUCTURE, REFRIGERATION EQUIPMENT, TEST AND COMMSSIONING BEFORE THE SITE ACCEPTANCE.

1994 - 1996 BELGORX BELGIUM.
TURKEY - ISTANBUL (CARDIOLOGIE HOSPITAL PROJECT).
POSITION: SITE CONSTRUCTION MANAGER.
SANITARY AND ELECTRICAL INSTALLATION.
INTERNAL RADIO TELECOMMUNICATION.
MEDICAL EQUIPMENT.
GENSET POWER PLANT.

6 MOUNTH CONTRACT - SIH ALGER/ALGERIA. - (SOCIETE D’INVESTISSEMENT HOTELIERE).
FEASIBILITY & SYNTHESIS OF PROJECT HOTEL SHERATON ORAN /ALGERIA 78000MIL USD (74000 m2 OF PROJECT CONSTRUCTION).
COMPOSITION OF THE PROJECT: 325 ROOMS, ONE CONGRES BUILDING OF CAPACITY OF 3000 PEOPLES, 3 RESTAURANT, 1 SWIMMING POOL (INCLUDE FITNESS, DANCING), WATER TREATMENT PLANT (320 m3/hr),UNDERGROUNDPARKING (CAPACITY OF +/-1000 CARS).

6 MOUNTH CONTRACT - SOLVAY - (BULGARIA / DEVNIA).
EXTENSION OF SODIUM CARBONATE PRODUCTION PROJECT
POSITION :SITE CONSTRUCTION MANAGER.
CONCRETE AND STEEL CONSTRUCTION).


TELECOMMUNICATION MOBIL PROJECT BETWEEN 1997 - 2003

PROXIMUS BELGIUM.(SITE CONSTRUCTION COORDINATION).
BASE BELGIUM. (SITE CONSTRUCTION COORDINATION).
ORANGE TELECOM SWITZERLAND (REGIONAL MANAGER).
MOTOROLA TURKEY (REGIONAL MANAGER).
ERICSSON MAROCCO (REGIONAL MANAGER).
ALCATEL ASIA (REGIONAL MANAGER).


SOFTWARE EPERIENCE:
- WINDOW XP & MICROSOFT 2000
(Acces, Outlook, Word, Exel, Power Point).
- LOTUS NETWORK


Education

TECHNICAL ENGINEER 1970 - BELGIUM/NAMUR (IATA UNIVERSITY)



Skills

BUILDING CONSTRUCTION TECHNICAL ENGINEER

Languages

FRENCH, DUTCH, ENGLIS.
GERMAN GOOD KNOWLEG

Other

Ultaligth flying pilot (Quick Siler fligth)

 beschikbaar?

Interim managers zoeken:

Opdrachtomschrijving :